Skip to main content

Approvals & Paperwork

Permits & DISCOM Filings

Prepare and track the approvals a solar job needs, such as municipal permits, electrical inspectorate clearances and grid connection sanctions. Raise a permit against a customer and deal, so filing can start before installation.

Book a free demo

Free 30-minute walkthrough · reply within 1 working day

evo7 Permits: permit board on a computer and a phone
Illustrative example data

01Key capabilities

What it does.

Permit Filing Flow
  1. 01Raise a Permit Against Customer and Deal
  2. 02Complete the Form in the Document Editor
  3. 03Download the PDF and Submit It
  4. 04Record the Approved or Rejected Decision

At a glance

  • PDF download
  • Company form templates
  1. 01

    Permit board with Preparation, Submitted, Approved and Rejected stages. A rejected filing goes back to Preparation.

  2. 02

    When you record KSEB approval of Annexure-1 or Annexure-2 on a deal, evo7 raises a task to file the next form by the last valid day. The defaults are 30 and 365 days, and you can change them.

  3. 03

    Ready task lists for the KSEB net metering application and Electrical Inspectorate (CEIG) approval.

  4. 04

    Document editor that fills your company’s form template with customer and deal details.

  5. 05

    Warning when a linked customer detail changes after the document was made, with one-click regeneration.

  6. 06

    PDF download for signing, stamping and uploading to the government portal.

  7. 07

    Separate permission to record the authority’s decision, withdraw an application or void a permit.

  8. 08

    KSEB details on the deal, including consumer number, electrical section, connected load and tariff.

  9. 09

    Print the KSEB inverter test checklist from an installation.

Before you book

Common questions

Does evo7 submit applications to the authority for us?

No. You download the PDF, sign and stamp it, and upload it to the government portal yourself. evo7 keeps the stage, application number and decision reference.

Which permit forms are available?

Permit templates are set up for each company, so you see the forms set up for yours.

Does it track each step of a DISCOM application?

The permit board has no separate DISCOM stages. A ready KSEB net metering task list covers the application steps, and the deal holds the KSEB connection details.

Can we start a permit before installation?

Yes. A permit is raised against the customer and deal, so no installation is needed first.

Will it remind us before a KSEB approval lapses?

The task shows the last valid day. The alert is sent once the task is overdue, so plan to act before that date.

See it running on your own operations

A 30-minute walkthrough. Bring a recent quote, your stock sheet or a job that is stuck.

Free 30-minute walkthrough · reply within 1 working day